Make Smarter Siting and
Queue Decisions

Felix gives generation developers ISO-accurate transmission capacity data, upgrade cost forecasts, and scenario modeling across every major U.S. market — so you can move faster with more confidence at every stage of development.

Tighter Markets Demand a Higher Standard of Interconnection Analysis

Interconnection is complex and costly if approached with incomplete data.
Felix transforms each phase of your development journey to make better decisions from day one.

Prospecting
Local Studies
Deposit for $
Cluster Studies
Completion
00
01
l;ft
rgt
lwft
rgt
left
right
l

Accuracy- First Methodology Meets Customized Insights

Felix enables interconnection teams to develop a custom view of the grid in the fastest, most efficient way possible

Felix runs ISO-accurate injection studies against your assumptions — queue drop offs, retirements, transmission upgrades — across every POI in a region simultaneously.

Your market intelligence, built into the model.

Prospecting

Screen 1,000+ Substations in Minutes

Create your own heatmap across any ISO, updated with each model release, color-coded by capacity and upgrade cost exposure. Results on demand for every POI across a region — no manual GIS tracing, no consultant reports.

Felix's Prospecting Platform:

header-capacity
Local Studies

Stress-Test Your Best Sites Before You Commit

Deep-dive sensitivity analysis on a shortlist of priority POIs. Toggle local queue assumptions, run flexible custom scenarios, compare competing project scenarios — all re-running full ISO study methodology on your specific assumptions.

Felix's Local Studies Tool:

ISO-Aligned Results You Can Actually Trust

The reason other tools generate false positives isn’t a data problem — it’s a methodology problem. Felix replicates the exact study processes ISOs use, because it was built by people who ran those processes from the inside.

Methodology mirrors the ISOs

Felix replicates ISO injection study processes exactly — so your results reflect the network upgrades you’ll actually face.

Built by Transmission Experts

Felix’s team includes former planners and engineers from ISOs, utilities, and developers across every major U.S. market.

Proven at Scale

500+ GW modeled. $3B+ in ISO errors uncovered. 100+ developers trust us.

Ready to De-Risk Your Next Project ?

Discover how ISO-accurate data and real-time modeling can help you screen faster, reduce upgrade risk, and make confident go/no-go decisions, before you ever submit to the queue.