Felix gives utility and transmission-planning teams ISO-accurate study automation, so you can clear queues faster, stand behind every upgrade assignment, and free your engineers from manual spreadsheet work.
Run study-grade injection and deliverability analysis across many points of interconnection at once instead of one slow case at a time, so your team keeps up with growing generation and large-load queues.
Produce clear, ISO-aligned results that show exactly which constraints and upgrades a project triggers, so your determinations hold up to developer questions and regulatory review.
Felix handles the repetitive modeling and processing, so your planners spend their time on judgment and strategy instead of building cases and reconciling spreadsheets by hand.
Test retirements, queue changes, and planned upgrades to understand future system conditions before anything is built, and keep your long-term plans grounded in how the network really behaves.
A consistent, region-wide view of available substation capacity and upgrade-cost exposure, refreshed with each model release. It gives planning and interconnection teams one shared reference.
Re-run the full ISO study under your own queue, retirement, and upgrade assumptions, then compare scenarios side by side to pressure-test the outcome.
Felix replicates ERIS and NRIS studies exactly, rather than approximating with FCITC, using the same engines as the ISOs and utilities, so your internal results line up with the official ones.