Unlock Transmission Capacity Insights. Accelerate Time to Power.

Felix helps data center developers understand region-wide transmission capacity and identify POIs that minimize the time and cost of interconnecting— saving millions of $$ and years of time otherwise sunk into interconnection queues.

1
cursor
The Problem

Transmission Capacity:
the most critical resource is also the least visible

Interconnection is complex and costly if approached with incomplete data. Felix transforms each phase of your development journey to make better decisions from day one.

Without Felix
With Felix
Day 1

Understanding which POIs actually have transmission capacity available is increasingly difficult:

Developers need a proactive strategy and a way to test it.

We equip transmission planning teams with transparent, ISO–accurate tools to de-risk interconnection and enable efficient grid transformation
The Solution

A clearer lens on transmission capacity and the ability to stress test it.

Developers can see a more complete picture of where the Felix can deliver power, how much capacity truly exists, and how that capacity changes as new projects enter the queue.

With Felix, large-load teams can:

1
480
1
01 Screen every POI in a target region
02 Evaluate competitor load and new generation
03 Test new transmission solutions
04 Compare capacity estimates under different assumptions

Engineers Shouldn’t Be Doing Manual Spreadsheet Work

Felix automates all of it — so your team can focus on planning, not processing. Transmission planners are spending too much time on:

Let’s Talk

If you’re looking to accelerate planning studies, we’d love to talk to you.