Find the Best Sites With Reduced Interconnection Risks.

header-capacity

De-Risk Site Selection

Know upgrade risk and avoid surprise interconnection costs.

Accelerate Site Screening

Screen 1000+ substations in minutes to ensure top site selection

Visualize Capacity & Cost

Switch upgrade exposure to network upgrade costs

Drive Site Selection with Data

tab1
t2
tab3
tab4
01 Substation Heatmap
02 Upgrade Cost Estimates
03 Filter & Search
04 Data Export

Built for the Entire U.S. Transmission Network

Felix currently supports prospecting across major ISO and RTO regions in the U.S., with regular updates aligned to ISO queue model releases.

ERCOT

Book a Demo

Please input your work email for a demo.

We’ll reach out shortly to schedule some time. 

Frequently Asked Questions

Still have questions?

How long does a subscription last?
We offer annual subscriptions.
How many users come with a subscription?
Please contact us and we'll work together to find a price that works for your team.
How does the subscription work?
You pick which regions / ISOs you want to subscribe to. There's a different price per region and discounts for multiple regions.
Can we compare your data to studies we've done in the past?
Yes. Before you subscribe, we offer a benchmarking call where we compare Felix results with any studies you've done in the past. If you're interested, please book a demo.
What's the source of your data?
For developers, we request the latest power flow models from each ISO / utility on your behalf to use as the basis of analysis. The data within our applications are the result of ISO and utility-specific power analysis methodologies imposed on top of these models. We use the same software as ISOs and utilities, e.g. PowerGEM’s TARA and Siemens PTI’s PSS/e.

Ready to De-Risk Your Next Project ?

Discover how ISO-accurate data and real-time modeling can help you screen faster, reduce upgrade risk, and make confident go/no-go decisions, before you ever submit to the queue.