felix·fusion
EPCs

Bid the work you can actually deliver, at the price you can defend.

Estimate connection works, BoP, and grid-side risk before bid. Use the same topology your client's developer used, so disagreements are about numbers, not maps.

What you get

Connection works pricing engine

BoP envelope by zone and voltage

Constructability overlays (slope, access, soil)

Bid pack export

A typical workflow

  1. 01
    Receive the parcelImport the developer's parcel ID. GridScout already knows the connection point, voltage, headroom.
  2. 02
    Estimate connection worksPricing engine for switching gear, transformers, line, easement. Anchored to recent comparable projects.
  3. 03
    Layer BoP envelopeConstructability overlays: slope, access, soil, biodiversity. CapEx envelope by zone and voltage class.
  4. 04
    Export bid packSchedule of rates + technical narrative + risk register. Lender-grade, ready for review.

Stop bidding on land your grid model can't defend.

Book a 30-minute walkthrough on a region you know. We will surface three parcels you have not seen, and explain — line by line — why our score for one of yours disagrees with your developer's gut.